sandwich pot in the application work? industry news news 诸城市安泰机械有限公司-凯发体育下载平台

phone: 86-13356762078

fax:  86-536-6057366 

e-mail:

industry news
your current location : home news industry news

sandwich pot production company working in the application:
       1, using the vapor pressure shall not exceed the fixed working pressure for a long time.
       2, should be turned into the steam inlet valve slowly until the required pressure up, shut-off valve at the outlet of the condensate, if fitted trap, the valve should always be open;
      3, without the trap, the first steam valve open until there is a small overflow valve off and then open a small amount of water vapor in the degree to keep overflows.
      4, the safety valve can be used according to the user's own vapor pressure, self-adjusting. wok in use, should always pay attention to changes in vapor pressure, with inlet valve adjust.
      5, after stopping the intake should pot straight cock mouth open, put the finish i water.
      6, tilting pan and stirring sandwich before the class to use, you should refuel in all rotating parts; stirring the pot sandwich components on a decent pot, cooked vegetable oil is recommended;
   if any better suggestions can be fed back to the company, or visit our official website call and message. http://www.zcatjx.com

凯发体育下载平台 copyright:@2008-2012aetna zhucheng machinery co., ltd.   information miibenan:
adress:eastern city industrial district, mizhou street, zhucheng city, shandong province  fax: 86-536-6057366   

mobile phone: 86-15376682788  e-mail:   technical support: hengtai internet

网站地图